Building a house involves dozens of technical decisions before the first wall even goes up. An experienced architect’s role in a construction project goes beyond drawing up plans: it affects the budget, schedule and regulatory compliance of the finished building. The key is knowing which tasks to entrust to them and which to keep under your own responsibility.
Architect’s duties and client responsibilities: what the contract should specify
When a project is carried out by contractors under separate contracts (rather than through a single-family home construction contract), the division of tasks between the architect and the client is not set by law. It depends entirely on the contract they sign.
There are three levels of service. Design-only services cover the preliminary design, planning permission and construction drawings. Contractor consultation services also include reviewing quotes and helping select tradespeople. Full services additionally include site supervision, checking payment statements and assisting with the handover.
| Service | What the architect does | What the client manages |
|---|---|---|
| Design only | Plans, planning permission application, technical specifications | Contractor consultation, site supervision, handover |
| Design + consultation | Plans, planning permission, comparative quote analysis | Signing contracts, site supervision, handover |
| Full service | Plans, planning permission, consultation, site management, handover assistance | Final financial decisions, taking out insurance |
Clients who handle site supervision themselves must coordinate the work of each trade, manage delays and check that work complies with specifications before making payments. Resources such as batir-architecte.com can help clarify the scope of services offered by an architectural practice.
Setting out each service in writing before signing protects both parties. Without this clarity, a dispute over a defect identified at handover can become a legal deadlock, with each party shifting responsibility to the other.

RE2020 and carbon thresholds: why the planning permission date matters
The RE2020 environmental regulations set carbon emission thresholds for new buildings. For single-family homes, the carbon threshold is stricter for planning applications submitted from 2025 onwards, with a new threshold due to take effect in 2028.
In practical terms, choosing between a timber frame, traditional masonry or a hybrid system has different implications depending on when the planning application is submitted. An experienced architect compares structural and insulation options based on their documented carbon footprint (manufacturers’ FDES environmental product declarations), not just their upfront cost.
What this means for the design
The decision comes down to three main elements: the load-bearing structure, insulation and windows and doors. A project that meets the thresholds for the previous period may no longer comply with the next one if the materials have not been reconsidered.
- The load-bearing structure is the largest source of carbon emissions. Timber stores carbon, while concrete generates more emissions during production: comparing structural options early helps avoid redesigning the project after the planning application has been submitted.
- Bio-based insulation (wood fibre, cellulose wadding) has a more favourable carbon footprint than petrochemical insulation, but its cost and thickness vary depending on the local climate.
- Aluminium windows and doors have a higher carbon footprint than timber or PVC. The architect factors this into the choice of frame profiles from the initial design stage.
Planning for the 2028 threshold now, even if planning permission is submitted before then, can also increase the property’s resale value.
Geotechnical surveys and certificates: two requirements often discovered too late
In areas with moderate or high exposure to clay shrink-swell, a geotechnical survey is required in certain situations before the design is finalised. The builder or architect must then adapt the foundations to the survey’s recommendations or follow the prescribed regulatory techniques.
Foundation costs can vary considerably between stable and clay-rich soil. An architect familiar with local ground conditions will commission this survey before even drawing up the site layout, avoiding the need to resize the foundations later.
Certificates to provide on completion
Since 1 January 2024, the completion declaration must be accompanied by specific certificates where applicable, including those relating to earthquake-resistant construction and the prevention of clay soil shrink-swell. These documents cannot be improvised on the day the project is handed over.
An architect providing a full service includes these certificates in the schedule from the design stage. Clients who choose design-only services must ensure themselves that contractors provide the necessary supporting documents and that the inspection body (if there is one) confirms compliance.

Structural damage insurance and separate contracts: a responsibility that remains with the client
Regardless of the level of service entrusted to the architect, the client must take out structural damage insurance before work begins. This legal requirement is separate from the contractors’ and architect’s ten-year liability insurance.
Without a single-family home construction contract (CCMI), the client contracts directly with each company. This creates two risks: an inadequately insured tradesperson can undermine the entire chain of cover, and a claim not covered by structural damage insurance may require lengthy legal proceedings against the party found responsible.
Checks to make before signing contracts
- Request a valid ten-year liability insurance certificate from each company, specifying the types of work covered.
- Check that the structural damage insurance policy covers the exact nature of the project (single-family home, extension, additional storey).
- Keep a copy of the signed contracts for each work package, specifying deadlines, late penalties and the arrangements for partial handover.
An architect providing a full service will generally check these documents before work begins. With a partial service, this responsibility rests entirely with the client.
Choosing between a partial and full service is not just a matter of budget. It is a trade-off between the time the client can devote to the project and the level of risk they are willing to take on themselves. Regulatory requirements (RE2020, geotechnical surveys, certificates, structural damage insurance) do not disappear when you decide to manage the project yourself: responsibility for them simply shifts to you.